Society

Urgent Intervention Technique Following Power Outage at Alaouite in Timoulilt (Azilal)

The Béni Mellal-Khénifra Multi-Service Regional Company acted on Wednesday, May 20, 2026, following a technical failure that occurred in an end box of medium-voltage cables connected to the electrical transformer of the Timoulilt College, located in the municipal area of Timoulilt, Azilal province.

Immediate Mobilization of Teams

As soon as the issue was detected, an intervention unit from the electricity operations department in Béni Mellal was activated. A team specialized in the maintenance of underground medium-voltage cables was dispatched to the site to carry out the necessary repairs.

The technicians conducted a thorough on-site diagnostic to identify the root cause of the failure before replacing the damaged equipment, strictly adhering to safety and quality standards.

Quick Restoration of Power

Thanks to the prompt response of the mobilized teams, electric power was restored in a short timeframe within the affected areas, thus minimizing the impact of the outage on users.

Apologies and Commitment to Service

The Béni Mellal-Khénifra Multi-Service Regional Company expressed gratitude for the understanding of the residents of Timoulilt during this temporary interruption and apologized for the inconveniences caused by this unforeseen outage.

It reaffirmed its commitment to maintaining the continuity of public electricity service while ensuring its readiness to respond swiftly in case of incidents, and it continues its modernization and reinforcement programs for the electrical network.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button